Compare branch transfers, approved substitutes, and supplier replenishment to cover customer commitments while protecting each location's stock.
Where this helps
A customer order is short at the local warehouse while another branch has usable stock. The same imbalance can leave a fast-moving item close to a stockout even before an order is late. A useful recovery plan considers urgent commitments and branch replenishment together, so solving one shortage does not create another.
What Rectangle connects
Combine ERP orders, available-to-promise inventory, demand, protected stock levels, approved substitutions, and incoming receipts with WMS reservations and pick readiness. Add branch shuttle schedules, final delivery routes, and transfer costs. Count only unreserved stock and check the source branch’s remaining cover. Match technical specifications and customer approval before using a substitute.
Summit: 36 valves ordered · 24 local · 12 short · due 11:00 tomorrow.
- East: 16 equivalents available · 4 protected · 12 transferable.
- North: 20 bearings / 2 days · West: 300 / 30 days.
- Bearing demand: 10/day per branch · West minimum: 14 days.
A closer look
Two examples show how the same network view supports customer service and inventory planning. Summit’s order needs 36 valves, with 24 available locally. East has 16 approved equivalents available above existing reservations, with four protected for branch demand. Transferring 12 covers the order and preserves that minimum. The $48 shuttle reaches the depot at 08:10 for a 10:15 job-site delivery, ahead of the 11:00 promise. Separately, North has 20 bearings at demand of 10 per day, while West has 300 at the same daily demand. Moving 120 raises North to 14 days of cover and leaves West with 18 days, above its 14-day minimum. Tomorrow’s $75 shuttle is faster than a $220 supplier expedite arriving in three days.
Use two branch transfers to cover the order and restore stock cover.
- Summit: transfer 12 approved equivalent valves from East; retain East's four-unit minimum. Pick 24 originals locally. Proposed job-site arrival: 10:15 before the 11:00 promise.
- North: transfer 120 bearings from West. North reaches 14 days of cover; West retains 18 days against a 14-day minimum.
- Transport: $48 for the valve transfer and $75 for the bearing shuttle. The bearing supplier expedite would cost $220 and take three days.
Summit's agreed order value stays $666. Confirm shuttle capacity and substitution acceptance before reserving stock.
From answer to action
Prepare a single review queue with each item, quantity, origin, destination, promised arrival, remaining cover, and transport cost. Link the urgent transfer to the customer order and substitution approval; link the balancing transfer to the demand calculation. After review, connected tools can reserve stock, prepare the pick and transfer tasks, and update the delivery plan. Keep stock in transit separate from destination availability until physical receipt.
Draft valve transfer: East → depot · 24 originals + 12 equivalents.
- Draft bearing transfer: West → North · 120 units.
- Pick, receiving, and delivery references attached for planner review.
- Reserve after approval; destination stock updates on physical receipt.
Recover today’s order and prevent the next stockout with a plan that protects the whole branch network.



